Sunday, March 17th

The last verification between ISIS’ sequencer (so-called iMDC) and the Tyvak deployer are scheduled for today in the afternoon. We made all preparation before lunch to be able to start directly after lunch with the combined operations with Tyvak. The verification was executed as planned and all went well which …