Friday and Saturday, March 22nd and 23rd

Following integration, the next activities are planned on the VAB-SLP (the second launch pad). Those activities consist of removing the Remove Before Flight (“RBF”) pins of all QuadPacks (20 in total), the RBF of the ISIPOD for Aistech, and the RBF of the DuoPack by and for Spaceflight. For everyone …