And that is three

Being hand-carried to ISL, the Danish team arrived on Wednesday 7 May with their 1U CubeSat. After some preparatory talks, the team proceeded with performing a functional check-out, followed by a preliminary fit-check. Both checks yielded positive results, allowing them to explore downtown Delft that night.

On Thursday morning 8 May, this Danish 1U CubeSat was integrated in the third canister of this QuadPack. Inside this canister one of the two QB50-precursor 2U CubeSats was already accommodated, expediting the integration process.