With the QuadPacks flight-ready, the ISL-team today safely and securely packed them such that they can be transferred from their current location, namely the cleanroom in SP1-B (the satellite processing building) to the next location, namely cleanroom in SP2-B (the integrating-payload-with-LV building); this transfer will occur next week.

Also today the functionality of the ISIS’ in-house developed Sequencer was verified: the single Sequencer is used to operate all the  mechanisms that each deploy the satellites accommodated in the respective QuadPacks. The Flight Sequencer was activated and, in the presence of an ISRO quality assurance specialist, successfully showed its sequence as was previously agreed with ISRO.