Sunday, March 24th

Today it was a matter of being on time at SHAR again, meaning an early rise for the long drive back to SHAR. But before start of business a breakfast was prepared for us to avoid working on an empty stomach. Very kind and thoughtful of the ISRO team – many thanks for that!

After a short logistical hiccup at SP2-B (the building was closed on Sunday and keys were not readily available) the final actions on the launch tower could be executed.

  • Removal of RBF pins
  • Placing of the Add Before Flight (“ABF”) connectors to the iMDC
  • Checking the final configuration of the all deployers and iMDC for mission safety.

After this all was good to go!
It was again a good experience for all involved can look forward to the launch with confidence.